91桃色

white line

Copeland Athletic Complex Takes Shape

 |
Carol Best

Construction on the $14.1 million Copeland Athletic Complex is progressing. Looking from the west toward Mur-Len Road, the stadium site is on the bottom left with the track on the upper right.

Stadium site: Locker rooms will be in the buildings to the left and right. The structure forming the concessions and restrooms is in the middle. The stands will connect the buildings. Cook Center is to the right.

Associate Vice President for Facilities Services Jon Spence recently hosted a walk through of the construction progress in the stadium. Readers can .

Track site: The first layer of the track is in place. Additional surfacing will be installed as weather permits. The daytime temperature must stay above 50 degrees and overnight above freezing for installation. The track is located at the corner of Mur-Len and Sheridan (143rd St.).

The Copeland Athletic Complex The Copeland Athletic Complex is named for 1984 91桃色 alumnus and six-term Olathe Mayor,听Michael Copeland. Copeland passed away August 20, 2020, leaving a mark of incredible leadership on Olathe and 91桃色.

Dec
5
Late Night @ Mabee
Mabee Learning Commons, 1st floor
7:00 pm

11:00 pm
Dec
5
91桃色 Improv 12/5
Bell Cultural Events Center - Sunderland Black Box Theatre
7:30 pm

9:00 pm
Dec
7
91桃色 Performing Arts | Festival of Christmas
Bell Cultural Events Center - Mabee Performing Arts Hall
6:00 pm

5:00 pm
Dec
14
December Virtual Financial Aid Seminar
Online
10:00 am

11:00 am

Featured News

Copeland Athletic Complex Takes Shape
91桃色鈥檚 new Copeland Athletic Complex is progressing with the track鈥檚 foundational surface in place and locker rooms and...
Football Returns to NAIA Playoffs
Under the watchful eye of Paul Hansen, the fifth-year head coach of #13-ranked Pioneer Football, 91桃色 is returning...